The day was sunny and a bit warmer in Dublin today. It got up to into the low 50s.  Yesterday, the rebath guys came to hang the doors in the linen closet. Still waiting for the shower door to be installed. The electricians installed the last of the lighting fixtures yesterday. The ceiling fan light kit for the masterbedroom did not fit so we had to return it to Home Depot.  I am in the process of ordering a light kit directly from Hunter. I was bummed out the light kit did not fit the master bedroom ceiling fan. The office ceiling fan was installed with the correct light kit and looks fantastic. Check out the pictures of our new lighting fixtures.

Today, a friend of John's came by and installed heavy duty plywood to the kitchen floor to get it ready for laminate flooring. We plan to install porcelain tile at a later time. Tomorrow, we plan to go look at kitchen cabinets and laminate flooring.  If possible, with the remaining construction funds, we plan to get the plumbing done for the kitchen.  So later, when we buy the appliances, all we have to do is hook them up and we are good to go.
Tomorrow, the first coat of blue paint for the trim work in the bathroom will continue. The work is just about completed. We are just about We plan to apply two coats. Keep checking back for updates.

No comments:

Post a Comment

Followers of: My Life in Dublin, GA USA