HSH Interior Renovation Update

A beautiful, sunny, milder day in Dublin today. It got into the 60s. The central air and heat is completely done throughout the house and Paul came to pickup his final payment. The electric needs to be wired in the back part of the house. As for the bathroom, we have all functionality, that is all basic things are installed and working properly. The linen closet needs to be built/installed. We need some cosmetic things done, finish painting then install the washer/dryer, then I get in there and do some interior decorating :)

The first part of the day, running errands then the last part of the day will be spent on the bathroom most likely. It has been a pretty quiet day for the most part. Keep checking my blog for continual updates on the house.