Another busy, noisy day of interior renovations at the Hardy Smith House have been successful. No rain! Just mostly cloudy. Yesterday, about 3:30pm, it rained, so a little time was lost. We needed a little stress relief today so we went on a walk with our dogs and the dogs played with each other in the front yard. Not much went on on day 5 so I did not post an entry.
The installation of the beadboard in the bathroom is nearing completion. All the walls and ceiling will be outfitted in beadboard and painted entirely in white. It looks really nice. The window nearest the toilet area needs framing work done. John has to search for the original window framing so the beadboard for that wall can be completed.
The wiring for electric except the installation of switches, covers, plates, ceiling fans and lights in all but two rooms in the house are done. The masterbedroom and John's office are the two rooms left that need to be wired. The installation of the floorboards in the bathroom began today. The crown molding will start in the bathroom tomorrow. The door for the toilet and sink area will be installed tomorrow along with the special door that will hide the hot water heater and washer/dryer.
We have about a week to select the ceiling fans and lights we want throughout the house. Shopping for them will be the fun part. A special linen closet in the bathroom has yet to be built/installed. Tomorrow, the building of the walls and trimwork should be finished. Then the re-bath people will come in, install the new toilet, sink, shower, mirror above the sink and lay the tile for the floor. Here are a few pictures for your viewing pleasure. Enjoy. Keep checking my blog for updates as the renovation continues.
No comments:
Post a Comment