Search My Blog

11/24/09

HSH Interior Renovation Update



Cloudy, cool day in Dublin. The re-bath guys got here around 8am and worked until about 8:30 or 9:00pm. There were 3-4 guys working in installing the white hexagon tile. Painstaking work as you can see, but they got it done and it looks gorgeous! Tomorrow, they will be returning to put the grout in and around all the little tiles. It will be grayish in color. Notice how the light hits the tile in the close up shot of it. You can even see a slight reflection of the window near the toilet area. Just wait until I mop the floors, it will shine like what a beautiful floor should be. The ordering of these tiles were very difficult to get, which set back the work about a week but the wait was well worth it. I would presume another long day tomorrow. Friday, the plumbing will be completed, hopefully, following the installation of the sink, new toilet, shower head, hot water heater and the washer and dryer. The bathroom is almost done!!! Still waiting for the call/email for the 2 remaining lighting fixtures we need to get for the interior of the house which will require another trip to Atlanta. Next, focus, on the back part of the house, kitchen, storage area. I have been a little under the weather the past 3 days so this entry will be short. Enjoy some pictures I took of the bathroom today. Thanks for visiting and ceck back for updates to my blog.

No comments:

Post a Comment

Followers of: My Life in Dublin, GA USA